Coordinate questions
We send the same matrix to more than one factory so replies can be read together.
BeamSpan Sourcing helps business buyers compare alternative pre-engineered steel buildings and related site structures. It is an independent sourcing partner. It is not a manufacturer or an authorized dealer, and it is not affiliated with allied buildings. Factory history, plant capacity and brand warranties are not assets of this desk, so they are not restated here.
Review RFQ ChecklistCapture occupancy, footprint, eave height, bay spacing, clear span, and whether the building is permanent, relocatable or temporary.
Record buyer-supplied wind speed, wind exposure category, ground snow load and seismic design category. If a number is missing, it stays missing.
Mark shell, delivered, installed and turnkey as separate commercial boundaries, including foundation interface and utilities.
Ask the supplier which calculations, coating specs and plant quality statements apply to the quoted rigid frame and the project jurisdiction.
Line up quantity, destination, currency and exclusions before anyone ranks a figure. The buyer accepts or rejects the alternative.
We send the same matrix to more than one factory so replies can be read together.
A purlin package is not described as a finished building. Secondary framing stays named as secondary framing.
IBC, IRC, ASCE 7 and AISC 360 are listed only as documents to match to the site. We do not declare compliance.
Structural acceptance stays with the engineer the buyer appoints. We do not seal calculations.
Customer counts, acreage and certificates published by other companies stay with those companies.
A premium, mid-range, budget or undecided supplier preference is stored as a buyer note, not as a grade we verified.
Three limits follow from that role. First, without a jurisdiction we cannot talk about code compliance. Second, a transport envelope that blocks a volumetric module is a physical limit, not a negotiation point. Third, thermal transmittance and fire-resistance rating are properties of the assembly that gets quoted, and a different panel changes them. Optional budget in USD is either per building or for the whole order. It is a target, not a promised result.
If your team already has an erector, say so. The quotation can stop at a delivered shell. If the site has no local crane, the brief should ask who provides the crane lift plan. Those are purchasing choices. They are not a claim that BeamSpan Sourcing employs erection crews.
Send the six index items. We will compare alternative factory quotations and leave the contracting decision with you.
Request Factory Quotes