FREE sourcing support for qualified business buyers, with an eligible benefit of up to 3%. Eligibility applies to qualified business buyers and is confirmed after we review your product, quantity, destination, and sourcing requirements.

Independent sourcing service. Not a manufacturer or an authorized dealer. Not affiliated with allied buildings.

BeamSpan Sourcing Scope and Document Review

BeamSpan Sourcing lines up what each factory must quote when a buyer is comparing alternatives to an allied buildings search. The desk is an independent sourcing partner. It is not a manufacturer or an authorized dealer, and it does not issue stamped drawings.

Send Project Requirements
  1. Building use and occupancy
  2. Footprint, eave height, bay spacing
  3. Wind, snow and seismic criteria
  4. Code jurisdiction
  5. Quantity of buildings or modules
  6. Destination and access limits
Reviewer comparing two steel building scope sheets

Shell package and turnkey scope are different offers

Volumetric modular construction can finish more work before arrival, but the transport envelope and crane lift plan become the constraint. Panelized construction may pack flatter, then the site absorbs more assembly and weather exposure. Neither method is universally cheaper. The table below is a buyer checklist, not a price list.

Line the quote must labelShell or kitTurnkey scope
Primary frame and rigid frame reactionsUsually includedIncluded, still needs the engineer of record to accept reactions
Secondary framing, purlins and girtsConfirm spacing and finishConfirm the same spacing so the envelopes match
Insulated metal panel and thermal transmittanceOften optionalAsk for the R-value or U-value that was priced
Foundation interface and anchor boltsTypically excludedState whether design, supply and placement are included
Installation and crane lift planBuyer or local erectorName the erector, the weather window and the exclusions
Permits and special inspectionsBuyerStill often local; do not assume they ride inside the building price

A worked purchasing example: a distributor needs one 70 ft by 140 ft equipment warehouse, eave height 22 ft, a mezzanine live load to be set by the project engineer, and a destination in central Texas. The first reply prices a hot-rolled steel shell delivered to the gate. The second reply prices panelized erection including girts but excludes the slab. Until both replies use the same rows, the totals are not comparable. This is a method example, not a completed BeamSpan project.

Checks this desk coordinates

  • 1

    One requirements matrix

    Each supplier sees the same use, clear span, loads, jurisdiction, quantity and destination. Open items stay marked open.

  • 2

    Document list for the quoted system

    Calculations, weld procedure references under AWS D1.1 when welding is offered, and coating mass for the stated steel grade. IAS AC472 or ISO 9001 is requested only if it covers that plant and system.

  • 3

    Commercial normalization

    Freight, tax, duty and installation sit on their own lines. An optional USD budget states currency and whether it is per building or the whole order.

  • 4

    Deviation log

    A substituted girt spacing, a lower fire-resistance rating or a changed door opening is recorded before anyone accepts the alternative.

Limits sit in the same file. This service cannot stamp a design, pull a permit, or decide that a building meets IBC for a city it has not been given. It also cannot treat a standard bay as equivalent to a custom crane building. If the site wind speed is unknown, the comparison waits.

Standard layouts reduce drawing time when the published module dimensions fit the lot. Project-specific engineering fits unusual spans, collateral loads and local amendments. Say which path you want so a factory does not guess. Read inquiry options or send the matrix.

Questions buyers ask before the first round

Which costs need their own line?

Freight to the destination, unloading, sales tax, foundation design, slab, mechanical rough-in and erection. A building price that folds some of these in cannot be ranked against a shell price.

What is a supplier preference?

Premium, mid-range, budget or undecided describes the documentation and coating level you want to see. It is not a score this desk has audited.

Can two code paths share one total?

No. A permanent steel building under the IBC and a manufactured home under the HUD Code answer different rules. Keep them in separate briefs.

Who accepts the alternative?

The buyer and the qualified project professionals. BeamSpan Sourcing organizes questions and quotations. Availability, price and delivery remain subject to the supplier reply.

Ask for factory quotations on the scope you wrote

Send the checklist, the quantity and the destination. We will not convert a brand search into a claim that the original product is available from this site.

Request Factory Quotes